Welcome to Site Installations

Site Installations Projects

Loughborough WWTW sludge pump upgrade

Removal of existing sludge recirculation and sludge transfer pumps and replacement with new Willets pumps, Flygt pumps and associated 150-300mm ductile iron pipework.


.


Hot Tapping

80mm PN16 Hot Tapping on a 300mm ductile iron washwater main at Minworth WwTW near Birmingham


.


Ductile Iron Installation

150mm ductile iron installation on digested sludge pipe work at Minworth WwTW for Severn Trent, which included breaking into existing pipework.


.


Screen Installation on CSO at Mold North Wales

Mec Mex screen installation for Hydrok in CSO chamber at entrance to Mold WwTW


.


Knostrop Polymer Dosing Installation

Polymer dosing installation at Knostrop WwTW Leeds for SNF UK.


.