
Site Installations Projects
Loughborough WWTW sludge pump upgrade
Removal of existing sludge recirculation and sludge transfer pumps and replacement with new Willets pumps, Flygt pumps and associated 150-300mm ductile iron pipework.
![]()
Hot Tapping
![]()
Ductile Iron Installation
150mm ductile iron installation on digested sludge pipe work at Minworth WwTW for Severn Trent, which included breaking into existing pipework.
![]()
Screen Installation on CSO at Mold North Wales
![]()
Knostrop Polymer Dosing Installation
![]()
